Alumni Centre

The proposal is for a new three-storey 3,942 m2 Alumni Centre, including a multi-purpose Celebration Space and offices.

DP 10033 (CBP 13004)

East Mall and University Boulevard.

  • DP Application Received - September 28, 2010
  • Application was put on hold - December 2010
  • Updated proposal received - January 2013
  • Public Consultation - Open House was held on Tuesday, October 19, 2010, 3:30 p.m - 6:30 p.m at North Concourse, SUB, 6138 Student Union Blvd. A second Open House was held on Tuesday, April 2, 2013 from 11:30 a.m. - 1:30 p.m. in the Southwest Concourse (near the Outpost/Post Office), SUB, 6138 Student Union Blvd.
  • Development Permit issued September 2013
  • Start Construction - Winter 2013

Description

The UBC Alumni Centre will occupy a prime location at the heart of the campus. The building is designed to look like a floating glass cloud, and second and third floor will collect solar energy to help heat the building. The interior of the building will feature local Douglas fir.

The new AMS Student Union Building (SUB) and Alumni Centre will frame the east and south edges of University Square. The two buildings will share an ‘arrivals court’ to the east of the Alumni Centre site.

Proponents

  • Alumni Affairs
  • UBC Project Services

Manager, Development Services
(604) 822-1586

Attachments
FileCategory
Reference Material
Reference Material
Reference Material
Reference Material
Reference Material
Reference Material
Reference Material