For detailed information on road closures on campus, see drop downs below. These are updated regularly but if you see something missing or have questions, email info.planning@ubc.ca. For event related road closures, contact outdoor.events@ubc.ca.
Construction related road closures
NW Marine Drive partial closure - November 21 7:00am to 7:00pm
As part of construction for the Lower Mall Precinct project, a crane will be mobilized on Saturday, November 21, requiring a temporary road closure from 7:00 a.m. to 7:00 p.m.
Traffic impacts
- NW Marine Drive will be closed between the north side of the Marine Drive Residence entrance and the north side of University Boulevard for the duration of the work.
- A soft road closure will be in place on westbound NW Marine Drive at West Mall, allowing access for local residents only.
What to expect
- Traffic Control Personnel (TCP) will be on site to help direct vehicles, cyclists, and pedestrians.
- Access through the closure area will be limited to Marine Drive House residents and authorized construction traffic.
- Sidewalks and pathways will remain open, although brief stoppages may occur during crane operations.
- The 68 UBC Exchange bus route will be detoured.
- Emergency services have been notified and will maintain access as required.
Please plan ahead and allow extra travel time if you are moving through the area.
Thunderbird Boulevard Closure - November 23
Work is continuing east on Thunderbird Boulevard resulting in more lane closures and detours:
- Currently in Phase 4 electrical work between East Mall and Larkin Drive. Access to residential underground parking maintained from East Mall. Repaving is planned for later the week of November 16th.
- Work will move into Phase 5 starting November 23. This will result in a full closure of the southbound lane on East Mall. All southbound traffic will be detoured at Agronomy Road to either go east to Wesbrook Mall (to head south) or west to West Mall. This will result in congestion and delays, so please plan ahead.
Lower Mall and University Boulevard Closures – February 2026 to January 2027
Utility work for the Lower Mall Precinct development and Sauder Powerhouse Expansion, as well as expansion to the District Energy System will be done from February to November 2026 and will result in a number of road closures on the west side of campus. This work will be done in phases to minimize impact to the campus community.
Click here for details of each phase
Hospital Lane Closed Between Health Sciences Mall and East Mall for FBIC Renovations – February 2nd to November 2026
- Full closure required to complete renovation work at the Food and Beverage Innovation Precinct.
- Access to loading area for School of Population and Public Health maintained from East Mall.
- Sidewalk will remain open.
West Mall Utility Work from Memorial Road to University Boulevard until November 2026
- West Mall is closed for utility work from Memorial Road to University Boulevard until November 2026.
- Any through traffic must use NW Marine Drive to Agronomy Road.
- The east sidewalk along West Mall is closed from University Boulevard to the Geography Building. Pedestrians are detoured to Main Mall or the west side of West Mall.
- No public traffic is permitted north of Biosciences Road on West Mall due to the work at West Mall and University Boulevard. The only exceptions are:
- UBC fleet vehicles
- People with mobility challenges requiring closer access. This is best communicated with SPARC passes in rearview mirrors for the flagger to easily identify.
- Construction traffic and deliveries.
Gateway North - December 2025 to December 2027
- Key impact of this work is the detour for pedestrians moving north south in the area. Use the sidewalk on the east side of Wesbrook Mall or Athlete’s Walk west of War Memorial Gym.
Wesbrook Place Construction
Construction is currently underway for Lot BCR 7 on Wesbrook Mall in the Wesbrook Place neighbourhood.
Key impacts:
- The sidewalk along the east side of Wesbrook Mall from Ross Drive to Grey Avenue in front of the site will remain closed until the project is complete.
- On-street parking along the east side of Wesbrook Mall from Ross Drive in front of the site will remain closed until the project is complete.
- Intermittent closures of on-street parking on the west side of Wesbrook Mall will be required from time to time to accommodate construction activity.
- Single lane or full road closures on Wesbrook Mall may be required from time to time to accommodate construction activity.
- All construction activity for the site has been instructed to use Wesbrook Mall south of the site to arrive and depart to reduce impacts on Wesbrook Village area.