Engineering Student Centre

Updated: February 26, 2020
Image
map showing where the student centre is
The proposal was for the two-storey 934 m2 Engineering Student Centre to be built.

DP 11043 (CBP 13007)

    North of the existing Cheeze Factory in the Engineering Courtyard.

      • DP Application Received – December 21, 2011
      • Public Consultation - Open House held on February 1, 2012
      • Development Permit issued January 28, 2014
      • Start Construction - Spring 2014
      • Final Occupancy - November 2015

      Proponents

      • UBC Properties Trust
      • Urban Arts
      • Hapa Collaborative